Project Details
This page displays current information for project DEA: 07289104.
Project Information
Project Identifiers | Project ID: 213737 DEA: 07289104 EFIS: 0700021123 |
---|---|
DIST-CO-RTE-PM | 07-LA-405-11.9/13.2 |
Award Date | 01/09/2019 |
Closeout Date | 07/14/2022 |
Work Description | Rehabilitate the existing Commercial Vehicle Enforcement Facility. |
Location Description | LOS ANGELES COUNTY IN CARSON FROM DEL AMO BOULEVARD OVER CROSSING TO VERMONT AVENUE (190TH) UNDER CROSSING. |
QA Service Level | 1 (Verified on 08/26/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
samuel.gallardo@dot.ca.gov | Samuel Gallardo | Resident Engineer | Caltrans RE DB |
bernabe.contreras@dot.ca.gov | Bernabe Contreras Jr | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-17 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-07-28-5 | 07/28/2020 | 07/03/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-07-28-4 | 07/28/2020 | 07/03/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-07-28-3 | 07/28/2020 | 07/03/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-07-28-2 | 07/28/2020 | 07/03/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-02-26-2 | 02/26/2020 | 03/03/2020 | Stock | SMTL TM3 - Fastener Assembly | View |
2020-01-15-9 | 01/15/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
2020-01-15-8 | 01/15/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods