Project Details
This page displays current information for project DEA: 040J3804.
Project Information
Project Identifiers | Project ID: 213723 DEA: 040J3804 EFIS: 0413000462 |
---|---|
DIST-CO-RTE-PM | 04-CC-680-R11.0/R12.0 |
Award Date | 01/15/2019 |
Closeout Date | 11/09/2021 |
Work Description | CONSTRUCT SOIL NAIL WALLS AND GEOSYNTHETIC REINFORCED EMBANKMENTS |
Location Description | CONTRA COSTA COUNTY AT ALAMO FROM 0.3 MILE SOUGHT OF LIVORNA ROAD UNDERCROSSING TO 0.6 MILE SOUTH OF RUDGEAR ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 01/28/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amir.hatefi@dot.ca.gov | Amir Hatefi | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-04-01-1 | 04/01/2019 | 04/03/2019 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods