Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Samples
Samples submitted for this project.
Displaying 11-20 of 1399 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-02-13-28 | 02/13/2023 | 02/13/2023 | Acceptance | Aggregate | View |
2023-02-06-25 | 02/06/2023 | 02/10/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-02-07-41 | 02/07/2023 | 02/10/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-02-09-40 | 02/09/2023 | 02/10/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-02-09-31 | 02/09/2023 | 02/09/2023 | Acceptance | Aggregate | View |
2023-02-02-25 | 02/02/2023 | 02/07/2023 | Verification | Aggregate | View |
2023-02-02-31 | 02/02/2023 | 02/07/2023 | Per Request | Asphalt Binder | View |
2023-02-07-27 | 02/07/2023 | 02/07/2023 | Acceptance | Aggregate | View |
2023-02-06-21 | 02/06/2023 | 02/06/2023 | Acceptance | Aggregate | View |
2023-02-01-9 | 02/01/2023 | 02/02/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods