Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 161-170 of 1400 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-08-13 | 04/08/2021 | 04/09/2021 | Quality Assurance | Aggregate | View |
2021-04-12-19 | 04/12/2021 | 04/13/2021 | Quality Assurance | Aggregate | View |
2021-04-12-20 | 04/12/2021 | 04/13/2021 | Quality Assurance | Aggregate | View |
2021-04-13-3 | 04/13/2021 | 04/13/2021 | Quality Assurance | Aggregate | View |
2021-04-13-11 | 04/13/2021 | 04/14/2021 | Quality Assurance | Aggregate | View |
2021-04-20-14 | 04/20/2021 | 04/20/2021 | Quality Assurance | Aggregate | View |
2021-04-28-14 | 04/28/2021 | 04/28/2021 | Quality Assurance | Aggregate | View |
2021-04-27-20 | 04/27/2021 | 04/28/2021 | Quality Assurance | Aggregate | View |
2021-05-14-8 | 05/14/2021 | 05/18/2021 | Verification | Aggregate | View |
2021-05-14-14 | 05/14/2021 | 05/15/2021 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods