Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1341-1350 of 1400 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-02-07-41 | 02/07/2023 | 02/10/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-02-09-40 | 02/09/2023 | 02/10/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-02-13-37 | 02/13/2023 | 02/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-03-07-17 | 03/07/2023 | 03/07/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-03-08-61 | 03/08/2023 | 03/15/2023 | Quality Assurance | Hot Mix Asphalt | View |
2020-10-06-15 | 10/06/2020 | 10/08/2020 | Quality Control | Concrete | View |
2020-10-08-30 | 10/08/2020 | 10/12/2020 | Quality Control | Concrete | View |
2020-10-08-31 | 10/08/2020 | 10/12/2020 | Quality Control | Concrete | View |
2020-10-07-16 | 10/07/2020 | 10/12/2020 | Quality Control | Concrete | View |
2020-10-12-13 | 10/12/2020 | 10/13/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods