Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1231-1240 of 1400 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-07-26-16 | 07/26/2022 | 07/27/2022 | Quality Assurance | Concrete | View |
2022-07-27-7 | 07/27/2022 | 07/28/2022 | Quality Assurance | Concrete | View |
2022-07-19-65 | 07/19/2022 | 07/28/2022 | Verification | Aggregate | View |
2022-07-19-68 | 07/19/2022 | 07/28/2022 | Verification | Asphalt Binder | View |
2022-07-28-17 | 07/28/2022 | 07/29/2022 | Quality Assurance | Concrete | View |
2022-08-01-13 | 08/01/2022 | 08/02/2022 | Quality Assurance | Concrete | View |
2022-08-02-67 | 08/02/2022 | 08/03/2022 | Quality Assurance | Concrete | View |
2022-08-02-71 | 08/02/2022 | 08/03/2022 | Quality Assurance | Concrete | View |
2022-08-05-49 | 08/05/2022 | 08/06/2022 | Department Acceptance | Aggregate | View |
2022-08-08-64 | 08/08/2022 | 08/09/2022 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods