Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
| Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
| Award Date | 11/26/2019 |
| Closeout Date | 11/01/2023 |
| Work Description | Remove concrete pavement and base, and place HMA and JPCP |
| Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
| QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1221-1230 of 1400 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-07-11-95 | 07/11/2022 | 07/12/2022 | Quality Assurance | Concrete | View |
| 2022-07-12-74 | 07/12/2022 | 09/13/2022 | Quality Assurance | Concrete | View |
| 2022-07-13-78 | 07/13/2022 | 07/14/2022 | Quality Assurance | Concrete | View |
| 2022-07-15-79 | 07/15/2022 | 07/16/2022 | Quality Assurance | Concrete | View |
| 2022-07-18-69 | 07/18/2022 | 07/19/2022 | Quality Assurance | Concrete | View |
| 2022-07-19-65 | 07/19/2022 | 07/28/2022 | Verification | Aggregate | View |
| 2022-07-19-68 | 07/19/2022 | 07/28/2022 | Verification | Asphalt Binder | View |
| 2022-07-19-87 | 07/19/2022 | 07/20/2022 | Quality Assurance | Concrete | View |
| 2022-07-20-11 | 07/20/2022 | 07/21/2022 | Quality Assurance | Concrete | View |
| 2022-07-21-58 | 07/21/2022 | 07/22/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
