Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1081-1090 of 1400 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-04-23 | 01/04/2022 | 01/05/2022 | Quality Assurance | Concrete | View |
2022-01-13-12 | 01/13/2022 | 01/14/2022 | Quality Assurance | Concrete | View |
2022-01-06-40 | 01/06/2022 | 01/16/2022 | Quality Assurance | Concrete | View |
2022-01-14-3 | 01/14/2022 | 01/15/2022 | Quality Assurance | Concrete | View |
2022-01-14-4 | 01/14/2022 | 01/15/2022 | Quality Assurance | Concrete | View |
2022-01-17-6 | 01/17/2022 | 01/18/2022 | Quality Assurance | Concrete | View |
2022-01-12-21 | 01/12/2022 | 01/13/2022 | Quality Assurance | Concrete | View |
2022-01-07-15 | 01/07/2022 | 01/17/2022 | Quality Assurance | Concrete | View |
2022-01-07-16 | 01/07/2022 | 01/14/2022 | Quality Assurance | Concrete | View |
2022-01-20-14 | 01/20/2022 | 01/21/2022 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods