Project Details
This page displays current information for project DEA: 041G4304.
Project Information
Project Identifiers | Project ID: 213702 DEA: 041G4304 EFIS: 0412000126 |
---|---|
DIST-CO-RTE-PM | 04-NAP-128-R7.4 |
Award Date | 03/29/2019 |
Closeout Date | 12/08/2022 |
Work Description | REPLACE BRIDGE, HMA PAVING, DRAINAGE AND RSP |
Location Description | NAPA COUNTY NEAR SAINT HELENA AT CONN CREEK |
QA Service Level | 1 (Verified on 07/29/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
paramdeep.brar@dot.ca.gov | Paramdeep Brar | Resident Engineer | Caltrans RE DB |
nana.budu@dot.ca.gov | Nana Budu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 64 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-10-11-1 | 10/11/2019 | 10/14/2019 | Quality Assurance | Concrete | View |
2019-10-11-9 | 10/11/2019 | 10/17/2019 | Quality Assurance | Concrete | View |
2019-10-14-11 | 10/14/2019 | 10/17/2019 | Quality Assurance | Concrete | View |
2019-10-16-8 | 10/16/2019 | 10/17/2019 | Quality Assurance | Concrete | View |
2019-10-21-4 | 10/21/2019 | 10/22/2019 | Quality Assurance | Concrete | View |
2019-10-21-5 | 10/21/2019 | 10/22/2019 | Quality Assurance | Concrete | View |
2019-11-22-3 | 11/22/2019 | 11/25/2019 | Quality Assurance | Concrete | View |
2019-11-22-4 | 11/22/2019 | 11/25/2019 | Quality Assurance | Concrete | View |
2019-11-22-5 | 11/22/2019 | 11/25/2019 | Quality Assurance | Concrete | View |
2019-11-22-6 | 11/22/2019 | 11/25/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods