Project Details

This page displays current information for project DEA: 11430184.

Project Information

Project IdentifiersProject ID: 213682
DEA: 11430184
EFIS: 1117000215
DIST-CO-RTE-PM11-SD-805-8.4/8.8
Award Date12/13/2018
Closeout DateNot set
Work DescriptionBridge widening, HMA, barrier, drainage, RCP, and landscape work near Sweetwater River Bridge in Chula Vista. Widening of Sweetwater River Bridge in Chula Vista on 805.
Location DescriptionNear Sweetwater River Bridge in Chula Vista on 805.
QA Service Level1 (Verified on 06/01/2020)

Samples

Samples submitted for this project.
Displaying 1-10 of 14 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2019-07-25-807/25/201907/29/2019Quality AssuranceSMTL TM1 - Elastomeric Bearing PadView
2019-08-27-108/27/201908/30/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-08-28-108/28/201908/30/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-08-28-208/28/201908/30/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-11-15-3411/15/201911/20/2019Quality AssuranceSMTL TM5 - CouplersView
2019-11-15-4311/15/201912/23/2019Quality AssuranceSMTL TM5 - CouplersView
2020-02-20-1202/20/202003/03/2020Quality AssuranceSMTL TM5 - CouplersView
2020-04-14-1804/14/202004/22/2020Quality AssuranceSMTL TM5 - CouplersView
2020-05-12-105/12/202005/19/2020Quality AssuranceSMTL TM5 - Headed BarsView
2020-05-12-205/12/202005/19/2020Quality AssuranceSMTL TM5 - Headed BarsView

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted byLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods