Project Details
This page displays current information for project DEA: 081E8504.
Project Information
Project Identifiers | Project ID: 213650 DEA: 081E8504 EFIS: 0814000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD-142-0.0/5.8 |
Award Date | 11/19/2018 |
Closeout Date | 08/28/2020 |
Work Description | COLD PLANE/OVERLAY, HMA DIKES, INSTALL MGS AND DRAINAGE FACILITIES |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR CHINO HILLS FROM ORANGE COUNTY LINE TO ROUTE 142/71 SEPARATION. |
QA Service Level | 1 (Verified on 04/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 83 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-06-19-34 | 06/19/2019 | 08/06/2019 | Quality Assurance | Hot Mix Asphalt | View |
2019-06-19-25 | 06/19/2019 | 06/19/2019 | Department Acceptance | Hot Mix Asphalt | View |
2019-06-19-13 | 06/19/2019 | 06/19/2019 | Verification | Aggregate | View |
2019-06-18-16 | 06/18/2019 | 08/06/2019 | Quality Assurance | Hot Mix Asphalt | View |
2019-06-18-12 | 06/18/2019 | 06/19/2019 | Department Acceptance | Hot Mix Asphalt | View |
2019-06-18-8 | 06/18/2019 | 06/19/2019 | Verification | Aggregate | View |
2019-06-17-20 | 06/17/2019 | 08/06/2019 | Quality Assurance | Hot Mix Asphalt | View |
2019-06-17-16 | 06/17/2019 | 06/19/2019 | Department Acceptance | Hot Mix Asphalt | View |
2019-06-17-13 | 06/17/2019 | 06/17/2019 | Verification | Aggregate | View |
2019-06-14-10 | 06/14/2019 | 08/06/2019 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods