Project Details
This page displays current information for project DEA: 051H2904.
Project Information
Project Identifiers | Project ID: 213599 DEA: 051H2904 EFIS: 0516000058 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-13.8/R14.8 |
Award Date | 11/02/2018 |
Closeout Date | 05/29/2020 |
Work Description | UPGRADE PUMPING PLANTS AT 3 LOCATIONS. |
Location Description | SANTA BARBARA COUNTY IN SANTA BARBARA AT VARIOUS LOCATIONS FROM STATE STREET UNDERCROSSING TO CARRILLO STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 08/20/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
michael.mortensen@dot.ca.gov | Michael Mortensen | Resident Engineer | Caltrans RE DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods