Project Details
This page displays current information for project DEA: 080H4704.
Project Information
Project Identifiers | Project ID: 213477 DEA: 080H4704 EFIS: 0812000074 |
---|---|
DIST-CO-RTE-PM | 08-SBD-2-2.44 |
Award Date | 09/28/2018 |
Closeout Date | 01/18/2022 |
Work Description | WIDEN BRIDGE TO ACCOMMODATE STANDARD SHOULDERS |
Location Description | AT WRIGHTWOOD AT SHEEP CREEK BRIDGE |
QA Service Level | 1 (Verified on 12/31/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.santos@dot.ca.gov | John Santos | Resident Engineer | Caltrans RE DB |
md.rahman@dot.ca.gov | Md Rahman | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-08-17-3 | 08/17/2020 | 08/17/2020 | Verification | Aggregate | View |
2020-07-30-9 | 07/30/2020 | 07/31/2020 | Verification | Aggregate | View |
2020-01-29-14 | 01/29/2020 | 01/30/2020 | Quality Assurance | Concrete | View |
2019-11-21-13 | 11/21/2019 | 11/22/2019 | Quality Assurance | Concrete | View |
2019-10-30-5 | 10/30/2019 | 11/01/2019 | Quality Assurance | Concrete | View |
2019-10-14-40 | 10/14/2019 | 10/15/2019 | Quality Assurance | Concrete | View |
2019-10-08-1 | 10/08/2019 | 10/10/2019 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2019-10-08-2 | 10/08/2019 | 10/11/2019 | Quality Control | SMTL TM5 - Headed Bars | View |
2019-08-12-11 | 08/12/2019 | 08/13/2019 | Quality Assurance | Concrete | View |
2019-05-28-18 | 05/28/2019 | 06/03/2019 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods