Project Details
This page displays current information for project DEA: 06394604.
Project Information
Project Identifiers | Project ID: 213470 DEA: 06394604 EFIS: 0600020595 |
---|---|
DIST-CO-RTE-PM | 06-FRE-269-10.6/12.4 |
Award Date | 11/02/2018 |
Closeout Date | 10/15/2020 |
Work Description | REPLACE BRIDGES AND RECONSTRUCT ROADWAY. |
Location Description | FRESNO COUNTY NEAR HURON FROM 1.0 MILE NORTH OF PALMER AVENUE TO 0.4 MILE SOUTH OF ROUTE 198 |
QA Service Level | 1 (Verified on 09/25/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
nathan.quiroz@dot.ca.gov | Nathan Quiroz | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 25 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-03-15-4 | 03/15/2019 | 03/15/2019 | Quality Control | SMTL TM5 - Welded Hoops | View |
2019-03-15-3 | 03/15/2019 | 03/15/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2019-03-12-1 | 03/12/2019 | 03/14/2019 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2019-03-04-2 | 03/04/2019 | 03/06/2019 | Quality Control | SMTL TM5 - Welded Hoops | View |
2019-03-04-1 | 03/04/2019 | 03/06/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2019-02-25-2 | 02/25/2019 | 03/07/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2019-02-25-1 | 02/25/2019 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2019-02-22-4 | 02/22/2019 | 02/22/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2019-02-22-3 | 02/22/2019 | 02/22/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2019-02-22-2 | 02/22/2019 | 02/22/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods