Project Details
This page displays current information for project DEA: 030F2504.
Project Information
Project Identifiers | Project ID: 213406 DEA: 030F2504 EFIS: 0300000075 |
---|---|
DIST-CO-RTE-PM | 03-YOL,SAC-80-R11.1/R11.7,M0.0/M0.5 |
Award Date | 08/21/2020 |
Closeout Date | 07/31/2023 |
Work Description | SAC RIVER BOH (BRYTE BEND) |
Location Description | SACRAMENTO AND YOLO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVER BRIDGE AND OVERHEAD |
QA Service Level | 1 (Verified on 06/07/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Ephrem.Teweldeberhan@dot.ca.gov | Ephrem Teweldeberhan | Resident Engineer | Caltrans RE DB |
brent.bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 34 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-10-13-18 | 10/13/2021 | 10/14/2021 | Quality Assurance | Concrete | View |
2021-10-08-9 | 10/08/2021 | 10/11/2021 | Quality Assurance | Concrete | View |
2021-10-08-8 | 10/08/2021 | 10/11/2021 | Quality Assurance | Concrete | View |
2021-09-21-8 | 09/21/2021 | 09/22/2021 | Quality Assurance | Concrete | View |
2021-07-15-11 | 07/15/2021 | 07/16/2021 | Quality Assurance | Concrete | View |
2021-06-30-4 | 06/30/2021 | 07/01/2021 | Quality Assurance | Concrete | View |
2021-06-18-3 | 06/18/2021 | 06/21/2021 | Quality Assurance | Concrete | View |
2021-04-27-14 | 04/27/2021 | 04/29/2021 | Quality Assurance | Concrete | View |
2021-04-26-14 | 04/26/2021 | 04/27/2021 | Quality Assurance | Concrete | View |
2021-04-23-6 | 04/23/2021 | 04/26/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods