Project Details
This page displays current information for project DIME:213379.
Project Information
Project Identifiers | Project ID: 213379 Permit Numbers: 0716NMC1138 07186DP0879 0717NRW2198 |
---|---|
DIST-CO-RTE-PM | 07---2.3/3.3 |
Award Date | 01/01/2017 |
Closeout Date | 06/17/2021 |
Work Description | constructing the Westlake Boulevard Sidewalk Project (CI 5337) sponsored by the City which consists of sidewalk, retaining walls, curb ramps, a bus turn-out; installing a bus stop facility (shelter, bench, and trash receptacle), landscaping, irrigation, roadside signs, and other associated work; pl |
Location Description | SR-23 (Westlake Blvd.), Thousand Oaks |
QA Service Level | 1 (Verified on 06/04/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
sam.bakar@dot.ca.gov | Samir Bakar | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods