Project Details
This page displays current information for project DIME:213373.
Project Information
Project Identifiers | Project ID: 213373 Permit Numbers: 0715NMC0515 0719NRT0967 07196RT1090 0719NRT1851 07196RT1853 |
---|---|
DIST-CO-RTE-PM | 07---19.46/19.52 |
Award Date | 01/15/2016 |
Closeout Date | 06/17/2021 |
Work Description | widening for a separate right turn lane (northbound Pacific Coast Hwy to eastbound Torrance Blvd) that includes pavement reconstruction, AC pavement cold mill and overlay, constructing sidewalk, curb ramp, curb and gutter, and drainage inlet, traffic signal modifications, installing countdown pedes |
Location Description | Pacific Coast Highway, Redondo Beach |
QA Service Level | 1 (Verified on 09/25/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
noel.aclaro@dot.ca.gov | Noel Aclaro | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods