Project Details
This page displays current information for project DEA: 04013584.
Project Information
Project Identifiers | Project ID: 213267 DEA: 04013584 EFIS: 0416000289 |
---|---|
DIST-CO-RTE-PM | 04-SF-80-8.0/8.3,0.9/1.4 |
Award Date | 03/29/2018 |
Closeout Date | 12/30/2019 |
Work Description | Pier Retention |
Location Description | In San Francisco and Alameda Counties on Yerba Buena Island and .4 miles west of Oakland Toll plaza |
QA Service Level | 1 (Verified on 05/01/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
brian.boal@dot.ca.gov | Brian Boal | Resident Engineer | Caltrans RE DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 95 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-10-16-7 | 10/16/2018 | 10/18/2018 | Quality Assurance | Concrete | View |
2018-10-18-9 | 10/18/2018 | 10/31/2018 | Verification | Concrete | View |
2018-10-18-10 | 10/18/2018 | 10/31/2018 | Quality Assurance | Concrete | View |
2018-10-19-10 | 10/19/2018 | 10/31/2018 | Verification | Concrete | View |
2018-10-19-13 | 10/19/2018 | 10/31/2018 | Quality Assurance | Concrete | View |
2018-10-19-14 | 10/19/2018 | 10/31/2018 | Quality Assurance | Concrete | View |
2018-10-19-17 | 10/19/2018 | 11/09/2018 | Verification | Concrete | View |
2018-10-25-5 | 10/25/2018 | 10/31/2018 | Verification | Concrete | View |
2018-10-26-8 | 10/26/2018 | 10/31/2018 | Quality Assurance | Concrete | View |
2018-10-26-9 | 10/26/2018 | 10/31/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods