Project Details
This page displays current information for project DEA: 103A1304.
Project Information
Project Identifiers | Project ID: 213266 DEA: 103A1304 EFIS: 1000000412 COOP: 100480 |
---|---|
DIST-CO-RTE-PM | 10-MER-140-38.1/38.7 |
Award Date | 05/01/2018 |
Closeout Date | 02/10/2021 |
Work Description | Campus Parkway/SR140 project. Significant work includes CIP P/S bridge, piles, and lighting. |
Location Description | In Merced County on State Route 140 and the future connector road. |
QA Service Level | 2 (Verified on 04/04/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
davinder.singh@dot.ca.gov | Davinder Singh | Resident Engineer | Caltrans RE DB |
Bryan.Kroeger@nv5.com | Bryan Kroeger | Oversight Resident Engineer | Caltrans REO DB |
LelandM@quincyeng.com | Leland Mason | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-12-10-5 | 12/10/2018 | 12/12/2018 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods