Project Details
This page displays current information for project DEA: 010H9804.
Project Information
Project Identifiers | Project ID: 213203 DEA: 010H9804 EFIS: 0118000138 |
---|---|
DIST-CO-RTE-PM | 01-MEN-162-16.08 |
Award Date | 03/05/2018 |
Closeout Date | 10/05/2020 |
Work Description | Construct Soldier Pile Ground Anchor Wall |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/02/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nash.munes@dot.ca.gov | Nash Munes | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-10-30-1 | 10/30/2018 | 10/31/2018 | Verification | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods