Project Details
This page displays current information for project DEA: 043K9704.
Project Information
Project Identifiers | Project ID: 213149 DEA: 043K9704 EFIS: 0417000227 Permit Numbers: 0418NOP2127 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-6.2 |
Award Date | 02/25/2019 |
Closeout Date | 11/16/2021 |
Work Description | Construct a joint-use path (Pedestrian under-crossing) under US 101 from Bair Island Road to Convention Way. The Bair Island Road US 101 Undercrossing Project (Project), will connect Bair Island Road east of US 101 |
Location Description | Redwood City, Bair Island Rd connect with Convention Way under 101 |
QA Service Level | 2 (Verified on 02/21/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darryl.schram@dot.ca.gov | Darryl Schram | Resident Engineer | Caltrans RE DB |
achan@redwoodcity.org | Alex Chan | Oversight Resident Engineer | Caltrans REO DB |
dan.dait@dot.ca.gov | Dan Dait | Structural Representative | Caltrans SR DB |
achan@redwoodcity.org | Alex Chan | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods