Project Details
This page displays current information for project DEA: 041A6614.
Project Information
Project Identifiers | Project ID: 213099 DEA: 041A6614 EFIS: 0415000291 COOP: 042683A1 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-8.4 |
Award Date | 11/30/2020 |
Closeout Date | 12/12/2023 |
Work Description | CONSTRUCTION ON STATE HIGHWAY IN MARIN COUNTY IN LARKSPUR |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/06/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.russell@dot.ca.gov | Steven Russell | Resident Engineer | Caltrans RE DB |
long.ly@dot.ca.gov | Long Ly | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 89 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-27-2 | 07/27/2021 | 08/02/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-07-31-6 | 07/31/2021 | 08/06/2021 | Quality Assurance | Concrete | View |
2021-07-07-29 | 07/07/2021 | 08/06/2021 | Quality Assurance | Concrete | View |
2021-07-15-48 | 07/15/2021 | 08/06/2021 | Quality Assurance | Concrete | View |
2021-08-10-2 | 08/10/2021 | 08/11/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-08-31-1 | 08/31/2021 | 09/07/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-08-31-2 | 08/31/2021 | 09/07/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-08-07-7 | 08/07/2021 | 09/09/2021 | Quality Assurance | Concrete | View |
2021-08-06-32 | 08/06/2021 | Quality Assurance | Concrete | View | |
2021-08-20-38 | 08/20/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods