Project Details
This page displays current information for project DEA: 041A6614.
Project Information
Project Identifiers | Project ID: 213099 DEA: 041A6614 EFIS: 0415000291 COOP: 042683A1 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-8.4 |
Award Date | 11/30/2020 |
Closeout Date | 12/12/2023 |
Work Description | CONSTRUCTION ON STATE HIGHWAY IN MARIN COUNTY IN LARKSPUR |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/06/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.russell@dot.ca.gov | Steven Russell | Resident Engineer | Caltrans RE DB |
long.ly@dot.ca.gov | Long Ly | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 89 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-22-27 | 06/22/2021 | 07/01/2021 | Quality Assurance | Concrete | View |
2021-06-28-45 | 06/28/2021 | 06/29/2021 | Quality Control | Concrete | View |
2021-06-24-31 | 06/24/2021 | 06/25/2021 | Quality Control | Concrete | View |
2021-06-23-41 | 06/23/2021 | 06/24/2021 | Quality Control | Concrete | View |
2021-06-22-53 | 06/22/2021 | 06/23/2021 | Quality Control | Concrete | View |
2021-06-21-64 | 06/21/2021 | 06/22/2021 | Quality Control | Concrete | View |
2021-06-18-34 | 06/18/2021 | 06/21/2021 | Quality Control | Concrete | View |
2021-06-17-56 | 06/17/2021 | 06/18/2021 | Quality Control | Concrete | View |
2021-06-16-37 | 06/16/2021 | 06/17/2021 | Quality Control | Concrete | View |
2021-06-15-62 | 06/15/2021 | 06/16/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods