Project Details
This page displays current information for project DEA: 041K9904.
Project Information
Project Identifiers | Project ID: 213017 DEA: 041K9904 EFIS: 0416000339 COOP: TBD |
---|---|
DIST-CO-RTE-PM | 04-SF-101,92,84- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | (Alternative Delivery)CALTRAIN PENINSULA CORRIDOR ELECTRIFICATION PROJECT, a Design Build Project. Install bridge screening and OCS attachments on approximately 40 Caltrans structures that cross the rail line in the San Francisco peninsula. |
Location Description | San Francisco peninsula at various structures along rail line, to include 101, 280, 380, 92, 85, 237, and 880. |
QA Service Level | 2 (Verified on 02/06/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods