Project Details
This page displays current information for project DEA: 042640N4.
Project Information
Project Identifiers | Project ID: 213002 DEA: 042640N4 EFIS: 0412000649 |
---|---|
DIST-CO-RTE-PM | 04-MRN,SON-101-MRN27.0/27.6SON0.0/4.5 |
Award Date | 04/09/2018 |
Closeout Date | 03/12/2021 |
Work Description | CONSTRUCT HOV LANES |
Location Description | MARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING |
QA Service Level | 1 (Verified on 04/13/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hal.j.streater@dot.ca.gov | Hal Streater | Resident Engineer | Caltrans RE DB |
brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 91-97 of 97 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-12-10-17 | 12/10/2019 | 12/17/2019 | Quality Assurance | Concrete | View |
2019-12-13-5 | 12/13/2019 | 12/17/2019 | Quality Assurance | Concrete | View |
2020-01-14-19 | 01/14/2020 | 01/17/2020 | Quality Assurance | Concrete | View |
2020-01-28-11 | 01/28/2020 | 02/14/2020 | Quality Assurance | Concrete | View |
2020-01-29-20 | 01/29/2020 | 02/14/2020 | Quality Assurance | Concrete | View |
2018-08-23-2 | 08/23/2018 | 08/27/2018 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2019-04-11-1 | 04/11/2019 | 04/15/2019 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods