Project Details
This page displays current information for project DEA: 023H2104.
Project Information
Project Identifiers | Project ID: 212997 DEA: 023H2104 EFIS: 0217000070 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70,89-53.5/58.4,21.0/29.9 |
Award Date | 03/02/2018 |
Closeout Date | 01/09/2019 |
Work Description | AC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKING |
Location Description | PLUMAS COUNTY ON ROUTE 70 FROM GREENHORN RANCH ROAD TO 0.2 MILE EAST OF SLOAT ROAD AND ON ROUTE 89 FROM 0.3 MILE SOUTH OF ALTA CAMP ROAD TO CANYON DAM PICNIC AREA |
QA Service Level | 1 (Verified on 02/02/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ronald.collins@dot.ca.gov | Ronald Collins | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 23 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-07-20-14 | 07/20/2018 | 07/23/2018 | Acceptance | Hot Mix Asphalt | View |
2018-07-18-25 | 07/18/2018 | 10/15/2018 | Acceptance | Hot Mix Asphalt | View |
2018-07-17-19 | 07/17/2018 | 10/15/2018 | Acceptance | Hot Mix Asphalt | View |
2018-07-16-4 | 07/16/2018 | 07/16/2018 | Verification | Aggregate | View |
2018-07-16-2 | 07/16/2018 | 07/16/2018 | Verification | Hot Mix Asphalt | View |
2018-06-21-16 | 06/21/2018 | 06/21/2018 | Verification | Aggregate | View |
2018-06-21-7 | 06/21/2018 | 06/21/2018 | Verification | Hot Mix Asphalt | View |
2018-05-22-25 | 05/22/2018 | 05/23/2018 | Verification | Hot Mix Asphalt | View |
2018-05-22-24 | 05/22/2018 | 05/23/2018 | Verification | Asphalt Binder | View |
2018-05-22-23 | 05/22/2018 | 05/23/2018 | Verification | Reclaimed Asphalt Pavement | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods