Project Details

This page displays current information for project DEA: 033F5304.

Project Information

Project IdentifiersProject ID: 212993
DEA: 033F5304
EFIS: 0313000135
DIST-CO-RTE-PM03-ED-50-67.3
Award Date11/09/2018
Closeout Date09/20/2022
Work DescriptionECHO SUMMIT BRIDGE IS A 24-FT WIDE, THREE-SPAN, REINFORCED CONCRETE GIRDER BRIDGE
Location DescriptionEL DORADO COUNTY NEAR MEYERS AT ECHO SUMMIT SIDEHILL VIADUCT
QA Service Level1 (Verified on 01/08/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
nathan.alterton@dot.ca.govNathan AltertonResident EngineerCaltrans RE DB
Brandon.Miller@dot.ca.govBrandon MillerStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 61-70 of 72 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2019-05-15-605/15/201905/16/2019Quality AssuranceConcreteView
2019-05-15-705/15/201905/16/2019Quality AssuranceConcreteView
2019-05-07-205/07/201905/07/2019Department AcceptanceConcreteView
2019-05-07-1105/07/201905/07/2019Department AcceptanceConcreteView
2019-05-07-1405/07/201905/07/2019Quality AssuranceConcreteView
2019-05-02-105/02/201905/02/2019Quality AssuranceSMTL TM5 - Headed BarsView
2019-04-24-404/24/201904/25/2019Quality AssuranceSMTL TM5 - Headed BarsView
2019-04-24-504/24/201904/25/2019Quality AssuranceSMTL TM5 - Headed BarsView
2019-04-17-604/17/201904/18/2019Quality AssuranceConcreteView
2019-04-17-704/17/201904/18/2019Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods