Project Details

This page displays current information for project EFIS: 0415000339.

Project Information

Project IdentifiersProject ID: 212922
EFIS: 0415000339
Permit Numbers: 0417NOP1834 04176DP2017 04176DP2005
DIST-CO-RTE-PM04-SM-82-6/6.8
Award Date09/12/2017
Closeout Date01/22/2020
Work Descriptionthe Project improvements within Caltrans right-of-way include enhancing pedestrian facilities by widening existing sidewalks, utility adjustments, improving lighting, modifying drainage, installing crosswalk, and reconstructing curb ramps at Holly St., San Carlos Ave., and Cherry St...
Location DescriptionEl Camino Real, San Carlos
QA Service Level1 (Verified on 05/30/2018)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
douglas.inori@dot.ca.govDoug InoriResident EngineerCaltrans RE DB
tongthawornk@samtrans.comKitt TongthawornOversight Resident EngineerCaltrans REO DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods