Project Details
This page displays current information for project DEA: 04160304.
Project Information
Project Identifiers | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84-13.1/13.5 |
Award Date | 12/15/2020 |
Closeout Date | Not set |
Work Description | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT |
Location Description | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). |
QA Service Level | 1 (Verified on 09/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
oanh.bui@dot.ca.gov | Oanh Bui | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 141-150 of 195 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-06-29-20 | 06/29/2022 | 06/29/2022 | Quality Control | Aggregate | View |
2022-06-29-21 | 06/29/2022 | 06/29/2022 | Quality Control | Concrete | View |
2022-06-29-22 | 06/29/2022 | 06/29/2022 | Quality Control | Aggregate | View |
2022-07-29-1 | 07/29/2022 | 08/01/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-07-29-2 | 07/29/2022 | 07/29/2022 | Quality Control | SMTL TM5 - Headed Bars | View |
2022-07-29-3 | 07/29/2022 | 07/29/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-07-29-4 | 07/29/2022 | Quality Control | SMTL TM5 - Headed Bars | View | |
2022-07-29-5 | 07/29/2022 | 08/01/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-07-29-6 | 07/29/2022 | Quality Control | SMTL TM5 - Headed Bars | View | |
2022-08-27-12 | 08/27/2022 | 08/27/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods