Project Details

This page displays current information for project DEA: 04160304.

Project Information

Project IdentifiersProject ID: 212896
DEA: 04160304
EFIS: 0400000429
DIST-CO-RTE-PM04-ALA-84-13.1/13.5
Award Date12/15/2020
Closeout DateNot set
Work DescriptionNILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT
Location DescriptionIN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036).
QA Service Level1 (Verified on 09/16/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
oanh.bui@dot.ca.govOanh BuiStructural RepresentativeCaltrans SR DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 131-140 of 195 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-10-10-5810/10/202210/10/2022Quality ControlConcreteView
2022-10-10-5910/10/202210/10/2022Quality ControlConcreteView
2023-04-13-3004/13/202304/14/2023Quality ControlAggregateView
2023-04-13-3104/13/202304/14/2023Quality ControlAggregateView
2023-04-13-3304/13/202304/13/2023Quality ControlConcreteView
2021-03-25-103/25/202103/30/2021Quality AssuranceSMTL TM5 - Threaded BarView
2021-05-12-105/12/202105/18/2021Quality AssuranceSMTL TM5 - Welded HoopsView
2021-05-12-205/12/202105/18/2021Quality AssuranceSMTL TM5 - Welded HoopsView
2021-05-12-305/12/202105/18/2021Quality AssuranceSMTL TM5 - Welded HoopsView
2021-05-12-405/12/202105/18/2021Quality AssuranceSMTL TM5 - Welded HoopsView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods