Project Details
This page displays current information for project DEA: 024F2204.
Project Information
Project Identifiers | Project ID: 212775 DEA: 024F2204 EFIS: 0212000073 |
---|---|
DIST-CO-RTE-PM | 02-TRI-3-58.7/61.9 |
Award Date | 02/25/2021 |
Closeout Date | 05/06/2024 |
Work Description | REPLACE STRUCTURAL CONCRETE BRIDGE AND CULVERTS AND PLACE HMA. |
Location Description | TRINITY COUNTY NEAR TRINITY CENTER FROM 58.7 MILES NORTH OF PREACHER MEADOWS ROAD TO 60.7 MILES SOUTH OF EL DORADO WAY |
QA Service Level | 1 (Verified on 01/08/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mandhir.grewal@dot.ca.gov | Mandhir Grewal | Resident Engineer | Caltrans RE DB |
mike.sears@dot.ca.gov | Mike Sears | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-09-02-33 | 09/02/2021 | 09/02/2021 | Quality Control | Concrete | View |
2021-08-31-43 | 08/31/2021 | 08/31/2021 | Quality Control | Concrete | View |
2021-08-30-7 | 08/30/2021 | 08/30/2021 | Quality Control | Concrete | View |
2021-08-26-23 | 08/26/2021 | 08/26/2021 | Quality Control | Concrete | View |
2021-08-24-46 | 08/24/2021 | 08/24/2021 | Quality Control | Concrete | View |
2021-08-24-18 | 08/24/2021 | 08/24/2021 | Quality Control | Concrete | View |
2021-08-20-31 | 08/20/2021 | 08/20/2021 | Quality Control | Concrete | View |
2021-08-19-39 | 08/19/2021 | 08/19/2021 | Quality Control | Concrete | View |
2021-08-18-39 | 08/18/2021 | 08/18/2021 | Quality Control | Concrete | View |
2021-08-16-39 | 08/16/2021 | 08/16/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods