Project Details
This page displays current information for project DEA: 030H26U4.
Project Information
| Project Identifiers | Project ID: 212743 DEA: 030H26U4 EFIS: 0317000247 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-65-R5.0/R6.6 |
| Award Date | 02/14/2018 |
| Closeout Date | 10/21/2022 |
| Work Description | NORTHBOUND WIDENING AND RAMP IMPROVEMENTS. |
| Location Description | PLACER COUNTY IN AND NEAR ROSEVILLE AND ROCKLIN FROM 0.1 MILE SOUTH OF EAST ROSEVILLE VIADUCT TO 0.5 MILE SOUTH OF PLEASANT GROVE BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 12/18/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jeff.d.johnson@dot.ca.gov | Jeff Johnson | Resident Engineer | Caltrans RE DB |
| jimmer.ross@dot.ca.gov | James "Jimmer" Ross | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 131-140 of 180 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-08-17-4 | 08/17/2018 | 08/20/2018 | Quality Assurance | Concrete | View |
| 2018-08-15-8 | 08/15/2018 | 08/16/2018 | Quality Assurance | Concrete | View |
| 2018-08-15-6 | 08/15/2018 | 08/16/2018 | Quality Assurance | Concrete | View |
| 2018-08-15-3 | 08/15/2018 | 08/16/2018 | Quality Assurance | Concrete | View |
| 2018-08-15-2 | 08/15/2018 | 08/16/2018 | Quality Assurance | Concrete | View |
| 2018-08-14-6 | 08/14/2018 | 08/17/2018 | Quality Assurance | Concrete | View |
| 2018-08-13-2 | 08/13/2018 | 08/14/2018 | Quality Assurance | Concrete | View |
| 2018-08-09-7 | 08/09/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
| 2018-08-09-6 | 08/09/2018 | 08/10/2018 | Quality Assurance | Concrete | View |
| 2018-08-07-4 | 08/07/2018 | 08/03/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
