Project Details
This page displays current information for project DEA: 060S8304.
Project Information
Project Identifiers | Project ID: 212737 DEA: 060S8304 EFIS: 0615000046 |
---|---|
DIST-CO-RTE-PM | 06-FRE-5-44.4-45.4 |
Award Date | 05/26/2022 |
Closeout Date | Not set |
Work Description | TUMEY GULCH ABUTMENT REHAB BR# 42-0246L/R. |
Location Description | IN FRESNO COUNTY AT TUMEY GULCH. |
QA Service Level | 1 (Verified on 09/25/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
benjamin.holton@dot.ca.gov | Ben Holton | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 151 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-08-24-10 | 08/24/2017 | 09/20/2017 | Quality Control | Soil | View |
2017-08-29-6 | 08/29/2017 | 09/20/2017 | Quality Control | Soil | View |
2017-08-30-9 | 08/30/2017 | 09/20/2017 | Quality Control | Soil | View |
2022-08-29-55 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
2022-08-29-56 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
2022-08-29-57 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
2022-08-29-58 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
2022-08-29-59 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
2022-08-29-60 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
2022-08-29-61 | 08/29/2022 | 08/30/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods