Project Details
This page displays current information for project DEA: 07318004.
Project Information
Project Identifiers | Project ID: 212731 DEA: 07318004 EFIS: 0715000280 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-22.3/28.2 |
Award Date | 11/16/2017 |
Closeout Date | 06/16/2021 |
Work Description | TREAT BRIDGE DECK, CLOSURE POUR AND REPLACE JOINT SEALS. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM FREMONT AVENUE UNDERCROSSING TO RIO HONDO62 |
QA Service Level | 1 (Verified on 03/21/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
moe.izadpanah@dot.ca.gov | Moe Izadpanah | Resident Engineer | Caltrans RE DB |
jennifer.man@dot.ca.gov | Jennifer Man | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-06-17-1 | 06/17/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-08-25-1 | 08/25/2018 | 08/28/2018 | Quality Assurance | Concrete | View |
2018-04-09-4 | 04/09/2018 | 04/10/2018 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2018-01-26-1 | 01/26/2018 | 01/30/2018 | Proficiency | SMTL TM5 - Couplers | View |
2018-03-02-1 | 03/02/2018 | 04/05/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-03-02-2 | 03/02/2018 | Quality Control | SMTL TM5 - Couplers | View | |
2018-07-21-2 | 07/21/2018 | 08/06/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-07-28-1 | 07/28/2018 | 08/06/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-07-14-7 | 07/14/2018 | 08/06/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods