Project Details
This page displays current information for project DEA: 07291404.
Project Information
Project Identifiers | Project ID: 212720 DEA: 07291404 EFIS: 0712000094 |
---|---|
DIST-CO-RTE-PM | 07-LA-1-55-58 |
Award Date | 02/18/2021 |
Closeout Date | Not set |
Work Description | TRANCAS CREEK BRIDGE REPLACEMENT |
Location Description | IN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027). |
QA Service Level | 1 (Verified on 04/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dan.leon@dot.ca.gov | Dan Leon | Resident Engineer | Caltrans RE DB |
frank.lotfi@dot.ca.gov | Frank Lofti | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 254 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-08-29-73 | 08/29/2022 | 08/29/2022 | Quality Control | Concrete | View |
2022-08-26-79 | 08/26/2022 | 08/26/2022 | Quality Control | Concrete | View |
2022-08-24-79 | 08/24/2022 | 08/24/2022 | Quality Control | Concrete | View |
2022-09-15-63 | 09/15/2022 | 09/15/2022 | Quality Control | Concrete | View |
2022-09-13-43 | 09/13/2022 | 09/13/2022 | Quality Control | Concrete | View |
2022-09-29-1 | 09/29/2022 | 10/17/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
2022-09-24-14 | 09/24/2022 | 09/24/2022 | Quality Control | Concrete | View |
2022-09-24-13 | 09/24/2022 | 09/24/2022 | Quality Control | Concrete | View |
2022-09-24-12 | 09/24/2022 | 09/24/2022 | Quality Control | Concrete | View |
2022-09-24-11 | 09/24/2022 | 09/24/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods