Project Details
This page displays current information for project DEA: 07291404.
Project Information
| Project Identifiers | Project ID: 212720 DEA: 07291404 EFIS: 0712000094 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1-55-58 |
| Award Date | 02/18/2021 |
| Closeout Date | Not set |
| Work Description | TRANCAS CREEK BRIDGE REPLACEMENT |
| Location Description | IN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027). |
| QA Service Level | 1 (Verified on 04/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dan.leon@dot.ca.gov | Dan Leon | Resident Engineer | Caltrans RE DB |
| frank.lotfi@dot.ca.gov | Frank Lofti | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 315 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-07-29-54 | 07/29/2022 | 07/29/2022 | Quality Control | Concrete | View |
| 2022-07-29-55 | 07/29/2022 | 07/29/2022 | Quality Control | Concrete | View |
| 2022-07-28-7 | 07/28/2022 | 08/01/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2022-08-01-57 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
| 2022-08-01-58 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
| 2022-08-01-59 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
| 2022-08-01-60 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
| 2022-08-01-61 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
| 2022-08-01-62 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
| 2022-08-01-63 | 08/01/2022 | 08/01/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
