Project Details
This page displays current information for project DEA: 080Q8904.
Project Information
Project Identifiers | Project ID: 212688 DEA: 080Q8904 EFIS: 0800020582 |
---|---|
DIST-CO-RTE-PM | 08-RIV,SBD-10,215,111-Var |
Award Date | 11/17/2017 |
Closeout Date | 06/23/2021 |
Work Description | BRIDGE REHABILITATION |
Location Description | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 02/28/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Roberto.Castro@dot.ca.gov | Roberto Castro | Resident Engineer | Caltrans RE DB |
arnel.vega@dot.ca.gov | Arnel L. Vega | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-05-08-4 | 05/08/2018 | Quality Assurance | SMTL TM5 - Couplers | View | |
2018-04-20-4 | 04/20/2018 | 04/20/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods