Project Details
This page displays current information for project DEA: 06442544.
Project Information
Project Identifiers | Project ID: 212687 DEA: 06442544 EFIS: 0612000175 |
---|---|
DIST-CO-RTE-PM | 06-KER-46,5-31.5-33.2 |
Award Date | 01/11/2018 |
Closeout Date | 11/19/2021 |
Work Description | CONVERT 2-LANE TO 4-LANE CONVENTIONAL HIGHWAY. |
Location Description | KERN COUNTY NEAR LOST HILLS FROM 1.0 MILE EAST OF LOST HILLS ROAD TO 0.7 MILE EAST OF ROUTE 46/5 SEPARATION |
QA Service Level | 1 (Verified on 03/12/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amarjit.dhaliwal@dot.ca.gov | Amarjit Dhaliwal | Resident Engineer | Caltrans RE DB |
ramandeep.guraya@dot.ca.gov | Ramandeep Guraya | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-29 of 29 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-11-29-4 | 11/29/2018 | 12/04/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2019-01-31-2 | 01/31/2019 | 02/01/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-02-04-4 | 02/04/2019 | 02/06/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-02-05-1 | 02/05/2019 | 02/08/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-02-11-10 | 02/11/2019 | 02/19/2019 | Per Request | Concrete Core | View |
2019-06-26-1 | 06/26/2019 | 07/01/2019 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2019-06-26-2 | 06/26/2019 | 07/01/2019 | Quality Control | SMTL TM5 - Headed Bars | View |
2019-09-11-19 | 09/11/2019 | 09/16/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-10-31-1 | 10/31/2019 | 11/08/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods