Project Details
This page displays current information for project DEA: 044G1154.
Project Information
Project Identifiers | Project ID: 212654 DEA: 044G1154 EFIS: 0417000130 COOP: 42655 |
---|---|
DIST-CO-RTE-PM | 04-ALA-680-R6.8/R21.9 |
Award Date | 02/06/2018 |
Closeout Date | 06/06/2019 |
Work Description | RAMP METERING AND TRAFFIC OPERATION SYSTEMS (TOS) |
Location Description | ALAMEDA COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILES NORTH OF MISSION SAN JOSE SEPARATION (MISSION BLVD/RTE 238) TO 0.3 MILES NORTH OF ALCOSTA BLVD. OVERCROSSING |
QA Service Level | 1 (Verified on 02/13/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kharakbir.sandhu@dot.ca.gov | Kharakbir Sandhu | Resident Engineer | Caltrans RE DB |
Kharakbir.Sandhu@dot.ca.gov | Kharakbir Sandhu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 18 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-11-30-8 | 11/30/2018 | 02/19/2019 | Quality Control | Aggregate | View |
2018-11-30-9 | 11/30/2018 | 02/19/2019 | Quality Control | Aggregate | View |
2018-11-30-13 | 11/30/2018 | 02/19/2019 | Quality Control | Aggregate | View |
2018-11-06-8 | 11/06/2018 | 11/27/2018 | Quality Assurance | Concrete | View |
2018-09-17-11 | 09/17/2018 | 10/09/2018 | Quality Assurance | Concrete | View |
2018-09-12-6 | 09/12/2018 | 09/18/2018 | Quality Assurance | Concrete | View |
2018-09-12-7 | 09/12/2018 | 09/18/2018 | Quality Assurance | Concrete | View |
2018-09-10-5 | 09/10/2018 | 09/18/2018 | Quality Assurance | Concrete | View |
2018-09-10-6 | 09/10/2018 | 09/18/2018 | Quality Assurance | Concrete | View |
2018-09-05-8 | 09/05/2018 | 09/07/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods