Project Details
This page displays current information for project DEA: 044G0564.
Project Information
Project Identifiers | Project ID: 212618 DEA: 044G0564 EFIS: 0417000154 |
---|---|
DIST-CO-RTE-PM | 04-ALA-680-M2.4/M12.4 |
Award Date | 11/16/2017 |
Closeout Date | 12/08/2022 |
Work Description | ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS |
Location Description | FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/16/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
yannaing.tun@dot.ca.gov | Yannaing Tun | Resident Engineer | Caltrans RE DB |
jordan.jarosz@dot.ca.gov | Jordan Jarosz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 139 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-04-19-2 | 04/19/2018 | 04/20/2018 | Verification | SMTL TM3 - Fastener Assembly | View |
2018-11-20-1 | 11/20/2018 | 11/21/2018 | Verification | SMTL TM3 - Fastener Assembly | View |
2019-04-24-2 | 04/24/2019 | 04/26/2019 | Verification | SMTL TM3 - Fastener Assembly | View |
2020-08-07-18 | 08/07/2020 | Verification | Aggregate | View | |
2020-08-07-19 | 08/07/2020 | Verification | Hot Mix Asphalt | View | |
2020-07-24-44 | 07/24/2020 | 07/24/2020 | Verification | Aggregate | View |
2020-07-24-45 | 07/24/2020 | 07/24/2020 | Verification | Reclaimed Asphalt Pavement | View |
2020-07-24-46 | 07/24/2020 | 07/24/2020 | Verification | Hot Mix Asphalt | View |
2018-04-24-2 | 04/24/2018 | 04/27/2018 | Retest | SMTL TM5 - Threaded Bar | View |
2018-04-24-3 | 04/24/2018 | 04/27/2018 | Retest | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-2 of 2 results.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-318-2020-275 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 08/24/2020 | View | |
JMF3511-318-2020-271 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 08/17/2020 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods