Project Details

This page displays current information for project DEA: 044G0564.

Project Information

Project IdentifiersProject ID: 212618
DEA: 044G0564
EFIS: 0417000154
DIST-CO-RTE-PM04-ALA-680-M2.4/M12.4
Award Date11/16/2017
Closeout Date12/08/2022
Work DescriptionROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS
Location DescriptionFREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/16/2017)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
yannaing.tun@dot.ca.govYannaing TunResident EngineerCaltrans RE DB
jordan.jarosz@dot.ca.govJordan JaroszStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 51-60 of 139 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2019-06-17-1906/17/201907/17/2019Quality AssuranceConcreteView
2019-06-10-1106/10/201906/18/2019Quality AssuranceConcreteView
2019-06-04-1406/04/201906/18/2019Quality AssuranceConcreteView
2019-05-30-1305/30/201906/18/2019Quality AssuranceConcreteView
2019-05-24-1205/24/201906/18/2019Quality AssuranceConcreteView
2019-04-24-3904/24/201906/18/2019Quality AssuranceConcreteView
2019-04-24-204/24/201904/26/2019VerificationSMTL TM3 - Fastener AssemblyView
2019-04-18-204/18/201905/22/2019Quality AssuranceSMTL TM5 - Threaded BarView
2019-04-16-2404/16/201904/24/2019Quality AssuranceConcreteView
2019-04-08-604/08/201904/24/2019Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-318-2020-275Submittal Accepted for Verification CT D04 - Hayward DME / District Laboratory08/24/2020View
JMF3511-318-2020-271Submittal Accepted for Verification CT D04 - Hayward DME / District Laboratory08/17/2020View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods