Project Details
This page displays current information for project DEA: 081C5604.
Project Information
Project Identifiers | Project ID: 212589 DEA: 081C5604 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18-44.5/52.8 |
Award Date | 09/19/2017 |
Closeout Date | 06/23/2021 |
Work Description | SEDIMENT CONTROL AND STABILIZATION MEASURES |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR BIG BEAR LAKE FROM 0.2 MILE EAST OF ROUTE 38 TO GILDART DRIVE |
QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods