Project Details

This page displays current information for project DEA: 033F5604.

Project Information

Project IdentifiersProject ID: 212252
DEA: 033F5604
EFIS: 0313000033
DIST-CO-RTE-PM03-SUT,YUB-20-17.0/17.1,0.0/0.4
Award Date02/11/2021
Closeout Date01/25/2023
Work DescriptionINSTALL CAST-IN-STEEL SHELL CONCRETE PILE.
Location DescriptionSUTTER AND YUBA COUNTIES IN YUBA CITY AND MARYSVILLE AT THE FEATHER RIVER BRIDGE AND OVERHEAD
QA Service Level1 (Verified on 04/27/2018)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Selvendran.Manoharan@dot.ca.govSelvendran ManoharanResident EngineerCaltrans RE DB
brent_bullard@dot.ca.govBrent BullardStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 41-47 of 47 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2021-11-12-1211/12/202111/16/2021Quality AssuranceConcreteView
2021-11-12-1311/12/202111/16/2021Quality AssuranceConcreteView
2023-12-09-112/09/202312/11/2023Quality AssuranceConcreteView
2024-01-26-3101/26/202401/30/2024Quality AssuranceConcreteView
2024-01-30-3101/30/202402/01/2024Quality AssuranceConcreteView
2024-01-31-1901/31/202402/01/2024Quality AssuranceConcreteView
2024-02-07-902/07/202402/08/2024Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods