Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 981-990 of 1072 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-08-25-27 | 08/25/2022 | 08/22/2022 | Quality Control | Aggregate | View |
2022-08-25-28 | 08/25/2022 | 08/22/2022 | Quality Control | Aggregate | View |
2022-08-25-29 | 08/25/2022 | 08/22/2022 | Quality Control | Aggregate | View |
2022-09-28-7 | 09/28/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-01-17-2 | 01/17/2023 | 01/20/2023 | Quality Control | SMTL TM5 - Welded Hoops | View |
2023-01-23-2 | 01/23/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-02-08-34 | 02/08/2023 | 02/13/2023 | Quality Control | Concrete | View |
2023-02-14-28 | 02/14/2023 | 02/13/2023 | Quality Control | Concrete | View |
2023-02-15-23 | 02/15/2023 | 02/15/2023 | Quality Control | Concrete | View |
2023-02-16-11 | 02/16/2023 | 02/16/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods