Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Samples
Samples submitted for this project.
Displaying 751-760 of 880 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-16-61 | 05/16/2023 | 05/22/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-08-69 | 05/08/2023 | 05/22/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-11-88 | 05/11/2023 | 05/22/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-18-81 | 05/18/2023 | 05/22/2023 | Quality Assurance | Hot Mix Asphalt | View |
2020-04-27-5 | 04/27/2020 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2020-04-27-6 | 04/27/2020 | 04/30/2020 | Quality Control | SMTL TM5 - Welded Hoops | View |
2020-07-07-1 | 07/07/2020 | 07/08/2020 | Quality Control | Concrete | View |
2021-01-13-11 | 01/13/2021 | 01/14/2021 | Quality Control | Concrete | View |
2021-01-18-2 | 01/18/2021 | 01/19/2021 | Quality Control | Concrete | View |
2021-01-20-9 | 01/20/2021 | 01/21/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods