Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 961-970 of 1072 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-04-29 | 11/04/2023 | 11/16/2023 | Verification | Asphalt Binder | View |
2020-06-30-7 | 06/30/2020 | 06/30/2020 | Verification | Aggregate | View |
2020-07-10-6 | 07/10/2020 | 07/14/2020 | Verification | Aggregate | View |
2020-07-10-7 | 07/10/2020 | 07/14/2020 | Verification | Aggregate | View |
2020-07-21-3 | 07/21/2020 | 07/22/2020 | Verification | Aggregate | View |
2020-07-20-15 | 07/20/2020 | 07/21/2020 | Quality Assurance | Aggregate | View |
2020-07-21-22 | 07/21/2020 | 07/21/2020 | Quality Assurance | Aggregate | View |
2020-10-25-6 | 10/25/2020 | 11/25/2020 | Department Acceptance | Aggregate | View |
2021-01-14-20 | 01/14/2021 | 01/22/2021 | Verification | Aggregate | View |
2021-06-28-21 | 06/28/2021 | 06/30/2021 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods