Project Details
This page displays current information for project DEA: 080C2514.
Project Information
| Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
| Award Date | 06/06/2018 |
| Closeout Date | Not set |
| Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
| Location Description | LA/SBD County Line to PM 13.2 near I-15 |
| QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
| lnegrete@syrusaengineering.com | Luis Negrete | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 441-450 of 1072 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-10-10-5 | 10/10/2021 | 10/15/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-10-11-45 | 10/11/2021 | 10/12/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-10-12-49 | 10/12/2021 | 10/13/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-10-23-6 | 10/23/2021 | 10/30/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-10-23-7 | 10/23/2021 | 10/30/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-10-30-11 | 10/30/2021 | 11/05/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-10-30-12 | 10/30/2021 | 11/05/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-11-06-14 | 11/06/2021 | 11/10/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-11-08-55 | 11/08/2021 | 11/12/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-01-24-62 | 01/24/2022 | 01/27/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
