Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 991-1000 of 1072 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-02-12-8 | 02/12/2021 | 02/13/2021 | Quality Control | Concrete | View |
2021-02-11-16 | 02/11/2021 | 04/01/2021 | Quality Assurance | Hot Mix Asphalt | View |
2021-02-10-13 | 02/10/2021 | 02/11/2021 | Quality Control | Concrete | View |
2021-02-10-5 | 02/10/2021 | 02/11/2021 | Quality Assurance | Concrete | View |
2021-02-09-7 | 02/09/2021 | 02/12/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-02-08-12 | 02/08/2021 | 02/09/2021 | Quality Control | Concrete | View |
2021-02-04-6 | 02/04/2021 | 02/05/2021 | Quality Control | Concrete | View |
2021-02-01-10 | 02/01/2021 | 02/02/2021 | Quality Control | Concrete | View |
2021-01-26-10 | 01/26/2021 | 01/27/2021 | Quality Control | Concrete | View |
2021-01-20-9 | 01/20/2021 | 01/21/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods