Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 1071 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-08-21-1 | 08/21/2024 | 08/29/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-06-05-1 | 06/05/2024 | 06/20/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-05-03-4 | 05/03/2024 | 05/10/2024 | Per Request | SMTL TM5 - Couplers | View |
2024-04-04-5 | 04/04/2024 | 04/04/2024 | Quality Control | Concrete | View |
2024-03-07-23 | 03/07/2024 | 03/08/2024 | Quality Control | Polyester | View |
2024-03-01-17 | 03/01/2024 | 03/04/2024 | Quality Control | Polyester | View |
2024-01-11-2 | 01/11/2024 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2024-01-11-1 | 01/11/2024 | 01/16/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-12-21-6 | 12/21/2023 | 12/22/2023 | Quality Assurance | Concrete | View |
2023-12-01-24 | 12/01/2023 | 12/07/2023 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods