Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 941-950 of 1072 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-28-12 | 04/28/2021 | 05/03/2021 | Quality Assurance | Concrete | View |
2021-04-28-5 | 04/28/2021 | 04/30/2021 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2021-04-21-27 | 04/21/2021 | 04/23/2021 | Quality Assurance | Hot Mix Asphalt | View |
2021-04-21-12 | 04/21/2021 | 04/22/2021 | Quality Assurance | Concrete | View |
2021-04-20-28 | 04/20/2021 | 04/23/2021 | Quality Assurance | Hot Mix Asphalt | View |
2021-04-20-18 | 04/20/2021 | 04/26/2021 | Quality Assurance | Concrete | View |
2021-04-20-13 | 04/20/2021 | 04/21/2021 | Quality Assurance | Concrete | View |
2021-04-17-3 | 04/17/2021 | 04/18/2021 | Quality Control | Concrete | View |
2021-04-16-1 | 04/16/2021 | 04/20/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-04-15-9 | 04/15/2021 | 04/16/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods